page:migrate:heroku postgres:durable job state

Migrate Heroku Postgres: Durable job state

Move PostgreSQL data from Heroku Postgres to Ample, one component at a time. Destination verified on Ample: a jobs table with a state and attempts counter, processing inside a row-locked transaction, and a second run that is a no-op (job=done attempts=1 idempotent=true).

Source Procedure

Take a logical backup with heroku pg:backups:capture and download it, or pg_dump -Fc against the credentials from heroku pg:credentials:url. Not migrated automatically: Heroku Postgres followers, forks, rollback (PITR) and dataclips have no equivalent on the managed database.

Cutover

Put the app in maintenance mode with the user's go-ahead, take the final backup, restore, validate, redeploy with the managed DATABASE_URL, keep the Heroku database until confirmed.

Rollback

Keep the source untouched until you confirm; nothing at the source is changed or deleted by this guide.

Prerequisites

Workflow Steps

  1. Inventory the source: List what Heroku Postgres provides beyond the component you are moving. Out of scope here: Heroku Postgres followers, forks, rollback (PITR) and dataclips have no equivalent on the managed database.
  2. Source step 1: Take a logical backup with heroku pg:backups:capture and download it, or pg_dump -Fc against the credentials from heroku pg:credentials:url.
  3. Source step 2: Check the Postgres major version and extensions against the managed engine (PostgreSQL 16).
  4. Source step 3: Restore into a scratch managed database first and compare row counts.
  5. Provision and restore: Deploy the app once so a managed PostgreSQL 16 database exists (or create one with ample database create --engine postgres), then restore the dump with pg_restore using its connection string; keep migrations idempotent.
  6. Validate before cutover: Run the app's own checks and, for data, compare counts and checksums; the example checks are the pattern self-tests (/p/durable-job-state).
  7. Cut over: Put the app in maintenance mode with the user's go-ahead, take the final backup, restore, validate, redeploy with the managed DATABASE_URL, keep the Heroku database until confirmed.
  8. Rollback: Point DNS or configuration back to the source. The source was never modified; deletion is a separate, user-executed step after validation.

Success Checks

Limitations

Cost Estimate

Example

Evidence Summary

Formats

Next Actions