page:migrate:neon database:multi tenant relational data

Migrate Neon Database: Multi-tenant Relational Data

Summary

Move PostgreSQL data from Neon database to Ample, one component at a time. Destination verified on Ample: a tenant column on every row and query, with a cross-tenant read returning nothing (tenant_isolation=ok).

Source procedure: Take a logical backup with pg_dump -Fc from the primary branch. Not migrated automatically: Neon branching, autoscaling and scale-to-zero semantics have no equivalent; the managed database is one instance per app.

Cutover: Freeze writes at the source with the user's go-ahead, take the final dump, restore, validate, redeploy the app with the managed DATABASE_URL, keep the Neon project until confirmed.

Rollback: keep the source untouched until you confirm; nothing at the source is changed or deleted by this guide.

Prerequisites

Workload

Multi-tenant relational data

Migration Source

Neon database

Workflow Steps

  1. Inventory the source
    List what Neon database provides beyond the component you are moving. Out of scope here: Neon branching, autoscaling and scale-to-zero semantics have no equivalent; the managed database is one instance per app.

  2. Source step 1
    Take a logical backup with pg_dump -Fc from the primary branch.

  3. Source step 2
    Check the Postgres major version and extensions in use against the managed engine (PostgreSQL 16).

  4. Source step 3
    Restore into a scratch managed database first and compare row counts.

  5. Provision and restore
    Deploy the app once so a managed PostgreSQL 16 database exists (or create one with ample database create --engine postgres), then restore the dump with pg_restore using its connection string; keep migrations idempotent.

    ample database create --name  --engine postgres
    
  6. Validate before cutover
    Run the app's own checks and, for data, compare counts and checksums; the example checks are the pattern self-tests (/p/multi-tenant-relational-data).

  7. Cut over
    Freeze writes at the source with the user's go-ahead, take the final dump, restore, validate, redeploy the app with the managed DATABASE_URL, keep the Neon project until confirmed.

  8. Rollback
    Point DNS or configuration back to the source. The source was never modified; deletion is a separate, user-executed step after validation.

Success Checks

Limitations